200 bbls Condensate and Water Storage Tanks were completed.
30"x 10' 600 psia Vertical II Phase Separator was completed.
Construction of Troya’s new plant, 1,680 m2 closed area, completed in Batman OSB
12 ¼” VAREL PDC bit got high score with average 23 m/h ROP and total 1042 m drilling on Alasehir-Manisa geothermal field.
22,500 meters of Casing sold and delivered to Alaşehir/Manisa Geothermal field of Türkerler firm.
In Tuz Gölü Underground Natural Gas Storage Project, drilling of 12th well, last one, was completed.
Solar cell powered compact gas measuring skid which is formed of gas chromatograph, flow computer, 6” dual chamber orifice meter and 3” turbine meter was installed to sales line in Mardin.
3 x 2,000 BPD II Phase Test Separators were completed in our Batman plant.
In Selmo/BATMAN oil field, the maintenance of Flare Stack was completed and put into use.
<
>